Free renovation & upgrade estimate before you sell. Request yours →416-953-9545

Interior finishing

Flooring

The decision that most affects how a house feels underfoot and how it photographs, and the one most often made on material price alone — when the substrate underneath usually matters more.

Also called: Hardwood · Engineered · Luxury vinyl plank · Laminate

Scope

What the work is—and what it isn’t.

Most disputes begin with an exclusion nobody read. Confirm both columns against any quote you receive before comparing prices.

Normally included

  • Removal and disposal of existing flooring
  • Subfloor assessment, levelling and preparation
  • Underlay where specified
  • Supply and installation
  • Transitions, trim and quarter round

Normally excluded

  • Subfloor replacement
  • Asbestos abatement of old tile or mastic
  • Door undercutting, unless stated

What moves the price

Why two quotes for the same room differ.

These are the decisions and conditions that actually drive cost on this trade. Understand them and a wide spread between quotes usually explains itself.

  1. 01

    Subfloor condition and flatness. Levelling compound and sheet-good underlayment are common and rarely in the first quote.

  2. 02

    Material — solid hardwood, engineered, LVP, laminate and tile are genuinely different installations, not just different products.

  3. 03

    Whether existing flooring comes up, and what is under it. Old vinyl tile and its black mastic are a common asbestos source.

  4. 04

    Stairs. Always priced separately, always more than people expect.

  5. 05

    Layout — diagonal, herringbone and chevron add labour.

  6. 06

    Whether the house is occupied and furniture must be moved room by room.

  7. 07

    Concrete slabs, which need a moisture test before anything goes down.

Cost ranges

What it costs in Halton.

Cost ranges for this trade have not been published yet.

Rather than repeat a national average that means nothing in Halton, this table stays empty until the figures are ones I have priced myself. The cost drivers above are the part that matters most anyway—they explain why the numbers vary.

If you want a real number for your property, that is what the walkthrough is for.

Book a free walkthrough →

Before you sign

What the quote must contain.

If any of these is missing, ask for it in writing before you compare prices. A quote that cannot answer these questions is not a quote—it is an estimate wearing a suit.

Walk away

Red flags on this trade.

None of these are matters of taste. Each one has a specific consequence, and each is visible before you commit any money.

Before the final payment

Agree a written deficiency list before releasing the last payment. It is the only leverage that survives the end of a job.

If you are selling

What this does to a sale.

Consistent flooring through the main level reads as 'renovated' to buyers even when nothing else changed. Three different floors on one level reads as 'piecemeal'.

Ready to hire

I’ll give you one or two names, not a directory.

Contractors on the bench supply current WSIB, liability insurance and licence documentation, and I have walked their finished work. No referral fee is accepted from any of them.

A straightforward first conversation

Thinking about flooring?

Tell me where you are in the process. We’ll discuss the property, the market, and the questions that matter most to you.

Book a consultation